FOX EPOTHANE® COLORTOP is a two-component, epoxy resin-based, high chemical resistance, roller-applied coloured primer and coating material. It can be used as both a primer and a topcoat on industrial floors, delivering high performance in spaces subject to medium/light traffic loads and chemical exposure, such as car parks, garages, laboratories, warehouses and production areas.

Colour Palette

Packaging

5 kg
30 kg
TDS

Product Description

FOX EPOTHANE® COLORTOP is a two-component, epoxy resin-based, high chemical resistance, roller-applied coloured primer and coating material. The product can be applied as a primer and topcoat layer in the FOX DECOFLAKE CLASSIC system, as a protective topcoat on sand-broadcast surfaces, and as a primer prior to epoxy/polyurethane-based floor coatings. With a density of 1.50±0.05 g/cm³, a Shore D hardness of ≥75 and an adhesion strength of ≥2.5 N/mm², the product must be applied at substrate and ambient temperatures between +10°C and +30°C. When the two components (A+B) are mixed, the product offers approximately 45 minutes of pot life, becomes ready for pedestrian traffic after 1 day, for light traffic after 3 days, and reaches full cure in 7 days. It is available in RAL7001, RAL7032, RAL7035, RAL9010 and other RAL colours.

Advantages

  • Can be used as both primer and topcoat.
  • Easy to apply.
  • Can be highly filled with aggregates.
  • High chemical resistance.
  • High abrasion resistance.
  • Easy to maintain and clean.
  • Flowable consistency.
  • Provides hygienic environments.
  • Inhibits microbial growth.
  • Liquid-tight.
  • Delivers a glossy topcoat finish.
  • High adhesion strength.
PropertyValue
Density1,50±0,05 gr/cm³
ColourRAL7001, RAL7032, RAL7035, RAL9010 and RAL Colours
Shore D Hardness≥75
Adhesion Strength (EN 1542)≥2,5 N/mm²
A+B Component Viscosity (25°C)~1200 mPa.s
ThinningCannot be thinned
Pot Life~45 min
Substrate Application Temperature+10°C / +30°C
Pedestrian Traffic1 day
Light Traffic3 days
Full Cure7 days
Shelf Life12 months (from date of manufacture)
Concrete Substrate Min. Compressive Strength≥25 N/mm²
Concrete Substrate Min. Tensile Strength≥1,5 N/mm²

Usage Areas

  • As primer and topcoat in the FOX DECOFLAKE CLASSIC system
  • On interior, horizontal surfaces
  • As a protective topcoat on sand-broadcast surfaces
  • In car parks and garages
  • As a protective topcoat
  • As a primer prior to epoxy-based floor coatings
  • As a primer prior to polyurethane-based floor coatings
  • In areas subject to medium/light traffic loads
  • In areas requiring chemical resistance
  • In the chemical and pharmaceutical industry
  • In laboratories
  • In warehouses and production areas
  • In airports and supermarkets

Application Steps

  1. 1

    Surface Preparation

    The concrete substrates to be coated must be prepared using abrasive equipment (shot blasting, milling, diamond grinding, etc.) to remove the cement laitance and achieve an open-pore surface. Weak concrete sections must be removed, small voids and holes must be fully opened, and the resulting dust must be cleaned with an industrial vacuum. Voids, cracks and broken concrete must be filled with FOX MORTAR FC188 T / FOX FATSMORTAR FC245 / FOX FASTMORTAR FC233 or a mortar prepared by adding approximately 1.5 parts of 60–70 AFS (0.1–0.3 mm) quartz sand to 1 part FOX EPOTHANE® COLORTOP.

  2. 2

    Checking Application Conditions

    The surface moisture content must be below 4% (tested by CM measurement or oven-drying method); there must be no rising damp according to ASTM (polyethylene sheet test). Relative air humidity must be max. 80%, substrate temperature min. +10°C – max. +30°C, ambient temperature min. +10°C – max. +30°C, and material temperature min. +10°C – max. +30°C. It must be confirmed that the substrate temperature is at least +3°C above the dew point.

  3. 3

    Mixing

    Ensure that product temperatures are between +10°C and +30°C. Component A is mixed on its own using an electric mixer (300–400 rpm) and a suitable mixing paddle until a homogeneous colour is achieved with no product remaining at the bottom or sides of the container. Component B is then added entirely to Component A and mixed for at least 3 minutes until a homogeneous mixture is obtained. Excessive mixing should be avoided to minimise air entrainment.

  4. 4

    Priming

    After surface preparation is complete, FOX EPOTHANE® COLORTOP is poured onto the surface and spread with a squeegee. After squeegee application, the priming process is completed by back-rolling with a roller. Substrate temperature (min. +10°C) must be strictly observed.

  5. 5

    Coating Application

    In sand-broadcast systems, the material is applied with a rubber squeegee and then back-rolled with a roller to complete the application. In roller applications, the material is poured onto the surface, spread with a squeegee and back-rolled with a roller. In the FOX DECOFLAKE system, the material is likewise poured, spread with a squeegee and back-rolled. Where required, FOX EPOTHANE® ACC can be used to accelerate the curing time; contact the technical department for usage instructions.

  6. 6

    Tool Cleaning

    After application, tools and equipment used must be cleaned with solvents such as FOX CS810 or FOX C380. Once FOX EPOTHANE® COLORTOP has cured, it can only be removed from surfaces by mechanical means.

Critical

The substrate temperature must be a minimum of +10°C and a maximum of +30°C. Application must not be carried out outside this range.

Critical

After application is complete, the coating must be protected from direct water contact for at least 24 hours. Water contact will cause softening and blistering of the coating, leading to loss of properties; in such a case the coating must be completely removed and reapplied.

Critical

The surface moisture content must be below 4%. There must be no rising damp according to ASTM (polyethylene sheet test).

Critical

Beware of dew point and condensation. The substrate temperature must be at least +3°C above the dew point.

Critical

Concrete surfaces to be coated with epoxy/polyurethane must be at least 3 weeks old prior to application. A vapour barrier layer must be installed in slabs on grade.

Critical

Mixing must be carried out exclusively with an electric mixer at 300–400 rpm and the specified epoxy/polyurethane resin mixing paddle. Otherwise, air will be entrained into the product, causing air bubbles on the coating surface.

Critical

The product must not be thinned.

Important

Relative air humidity must be a maximum of 80%.

Important

Materials to be used should be brought to the application site 1–2 days in advance and allowed to acclimatise to ambient conditions.

Important

In cold weather applications, the ambient and substrate temperature should be raised; to improve workability, packaging should be conditioned at +20°C–+25°C before use.

Important

Rain, dust, wind, animals and insects must be prevented from entering the building while the coating is still fresh.

Important

Shelf life: 12 months from the date of manufacture when stored correctly between +5°C and +30°C, away from direct sunlight.

Important

Must be stored in its original unopened packaging, in a cool and dry environment, protected from frost. During short-term storage, a maximum of 3 pallets may be stacked; during long-term storage, pallets must not be stacked.

Critical

It is dangerous to approach storage and application areas with open flames; areas must be ventilated.

Critical

Appropriate work clothing, protective gloves, goggles and a mask must be worn during application in accordance with occupational safety regulations. Avoid contact with skin and eyes; in case of contact, wash thoroughly with plenty of water and soap; if swallowed, seek medical attention immediately.

Important

Food and beverages must not be brought into application areas. Store out of reach of children.

Information

Consumption figures are given for ideal conditions assuming an ambient and surface temperature of +20°C. It should be noted that consumption will increase on uneven surfaces and in cold weather conditions.

Information