FOX HARDTOP® FF300 BASKI BETON is a single-component, coloured, ready-to-use surface hardener composed of cement, specially selected quartz aggregate, pigments and additives, applied by dry-shaking onto freshly trowelled stamped concrete and screed surfaces. Thanks to its modified polymer content, it forms a monolithic structure with the concrete, resulting in a floor surface 2–4 times more durable than a standard concrete surface.
Colour Palette
Packaging
Product Description
FOX HARDTOP® FF300 BASKI BETON is a single-component, coloured, ready-to-use dry shake surface hardener composed of cement, specially selected quartz aggregate, pigments and additives. It is applied by dry-shaking onto freshly trowelled stamped concrete and screed surfaces. Thanks to the modified polymers it contains, it absorbs the bleed water from the floor concrete and, after trowelling, forms a monolithic structure with the concrete. The product achieves a compressive strength of 80 N/mm² at 28 days, enabling a floor surface 2–4 times more durable than a standard concrete surface. With its resistance to freeze-thaw cycles, it can be used safely in interior and exterior spaces, as well as in industrial and public areas. Colour options are available; for light-colour applications, a minimum of 7 kg/m² is recommended.
Advantages
- Easy to apply.
- The treated surface is 2–4 times more durable than a standard concrete surface.
- Thanks to the modified polymers it contains, it absorbs the bleed water from the floor concrete and, after trowelling, forms a monolithic structure with the concrete.
- Prevents surface dusting.
- Colour options are available.
- Easier to clean than a standard concrete surface.
- Resistant to freeze-thaw cycles.
Usage Areas
- In interior and exterior spaces
- In warehouses and hangars
- In garages
- In urban areas
- On roads
- In tourist facilities
- In parks
- In marinas and quays
- At fuel stations
- In open and covered car parks
- In shopping centres and public areas
- In areas where stamped concrete is applied, such as garden landscaping and interiors
Application Steps
- 1
Surface Quality
The compressive strength of the concrete to be treated must be at least 25 N/mm² (C25). For best results, the concrete slump values should be between 75–100 mm, the concrete should contain an adequate amount of cement (300–350 kg/m³), and the slab thickness should be at least 15 cm. Air-entrained concretes are not suitable.
- 2
Primer Application
In monolithic screed applications, FOX BINDER FM125 must be applied as a primer onto the roughened concrete surface before pouring, in order to ensure adhesion between the existing concrete and the screed. In floating screed applications, a polyethylene sheet must be laid over the existing concrete to prevent the screed concrete from bonding to it.
- 3
Concrete Pouring
Formwork must be set up in accordance with the project, and bags of FOX HARDTOP® FF300 BASKI BETON must be arranged along the main edges according to the planned consumption rates. Screeds with a water/cement ratio above 0.45 and a concrete class of at least C25 should be preferred. During concrete pouring, a vibrating screed must be used to compact the concrete; any water rising to the surface must be swept away with a wooden screed.
- 4
Dry-Shaking the Surface Hardener
Dry-shaking must not begin until the concrete has hardened sufficiently to leave a footprint of 0.75–1.0 cm depth when walked upon. In the first stage, 2/3 of the total consumption must be scattered over the concrete surface and spread with a bull float; the material must be allowed to absorb moisture (change colour), then disc-trowelled to integrate it with the concrete. The remaining 1/3 of the material must be applied in the same manner. For joint edges, the product must be mixed with a small amount of water to form a mortar and applied with a trowel.
- 5
Trowelling
After disc trowelling (helicopter pan trowelling), the process must progress from rough trowelling to fine trowelling. Fine trowelling with a blade must be carried out until the desired finish is achieved. Any material that spills onto adjacent panels during disc trowelling must be removed with a spatula.
- 6
Curing
After the surface hardener application is complete, a curing compound must be applied to the surface to prevent shrinkage cracks and ensure dust-free performance. Curing must be carried out in both summer and winter. Please contact SARTECH Technical Service for suitable curing compounds.
- 7
Joint Formation
Once the concrete has hardened sufficiently, the joints between panels must be cut to a minimum width of 4 mm and filled with PU sealant to prevent the risk of cracking and dusting.
- 8
Cleaning of Tools
Tools and equipment used must be cleaned immediately with water after application. Once FOX HARDTOP® FF300 BASKI BETON has hardened, it can only be removed from surfaces mechanically.
The compressive strength of the concrete to be treated must be at least 25 N/mm² (C25).
Air-entrained concretes are not suitable surfaces for surface hardener application.
Screeds to which FOX HARDTOP® FF300 BASKI BETON is to be applied must have a thickness exceeding 7 cm, a water/cement ratio above 0.45, and a concrete class of at least C25.
Dry-shaking must not begin until the concrete has hardened sufficiently to leave a footprint of 0.75–1.0 cm depth when walked upon.
After the surface hardener application is complete, a curing compound must be applied to the surface to prevent shrinkage cracks and ensure dust-free performance. Curing must be carried out in both summer and winter.
Once the concrete has hardened sufficiently, the joints between panels must be cut to a minimum width of 4 mm and filled with PU sealant.
FOX HARDTOP® FF300 BASKI BETON must not be scattered over long distances during application, in order to prevent segregation of the aggregates.
Opened packaging must be resealed and consumed within 1 week.
The product must be stored between +5°C and +30°C, away from direct sunlight, in a cool and dry environment. Protect from frost.
For short-term storage, pallets must not be stacked more than 3 high and must be dispatched on a first-in, first-out basis. For long-term storage, pallets must not be stacked on top of one another.
Protective clothing, gloves, goggles and a mask must be worn during application. Avoid contact with skin and eyes; in case of contact, wash immediately with plenty of water and soap. If swallowed, seek medical attention immediately.
Open flames near storage and application areas are dangerous; areas must be adequately ventilated.
Food and beverages must not be brought into application areas. Store out of reach of children.
The technical values above are given for +23°C and 50% relative humidity conditions. Higher temperatures shorten the times; lower temperatures extend them.